Completed Projects

Posted on 29th July 2020

Sybil Andrews Academy, Bury St Edmunds – Barnes Construction 

Interface Online and Offline carpet tiles fitted to 4 class-base areas, group room and circulation. Interface Barricade One to circulation and lobby areas.

Everything you need to create a dynamic modern floor.

Sidegate Primary School, Ipswich – 1st Floor Hall 

R W Hall Flooring were engaged by Sidegate Primary School, Ipswich to complete flooring to their 1st floor hall.

The flaking floor polish was mechanically removed from the floor followed by latex screed preparation. Our team fitted over 170m2 of Gerflor Taraflex Multi-use 6.2mm Wood Natural 4331 vinyl.

Taraflex Multi-use 6.2mm is a great product & helps significantly with sound reduction. It is heavily cushioned to help sports but also hardwearing enough to cope with demands of a primary school hall.

Ipswich Hospital – Breast Screening

New Altro Wood adhesive-free creates maximum impact with minimum downtime and offers high levels of comfort underfoot providing a safe, durable and decorative solution for busy spaces.

It can be welded and walked on the same day, and at the end of its life can be removed easily, allowing it to be reused or recycled.

Supplied & fitted Altro Wood Adhesive Free “Champagne Oak”

Boast International Limited, Felixstowe – Source One Consulting 

Supply & fit over 180m2 Forbo Alignment “Nucleus 208” carpet tiles to first floor areas, accounts office and boardroom. Multi-height loops give this distinctive floor covering a bold directional theme. Completed with Heckmondwike Hippo entrance tiles.

Altro Wood Adhesive Free “Pitch Oak AFW28008” to toilets.